Design and implementation of QMS framework in power plant projects. Garri4 project as a model, Sudan

2 röster
843 visningar
uppladdat: 2008-01-01
Inactive member

Inactive member

Nedanstående innehåll är skapat av Mimers Brunns besökare. Kommentera arbete
In recent years, many companies around the world have adopted different forms of quality systems, such as ISO-based quality systems, or BS-based quality systems. It has been perceived that a quality-based company provides higher quality services and products in comparison with non quality-based companies. As a result, quality-based companies have become reputable and attract more customers. In projects construction field, quality has become very essential for both contractors and owners. Contractors tend to provide high quality deliverables to satisfy their clients, and to remain successful in this turbulent business field, while owners want to receive high quality end-products and services, and to ensure that their deliverables matching contractual quality requirements. Therefore owners (whether operating companies or government sectors) have developed different means to measure quality in their projects, such as hiring professional consultants who cooperate with owner’s project team. If owners have developed reliable quality management system (QMS) and their staffs are experienced and competent with relevant technical and project management knowledge, then the result will be outstanding. This study is aimed to design, implement, and examine a QMS in Garri4 power plant project, NEC, Sudan – which has already completed 60% of its activities on the time of QMS implementation. The outcomes of this implementation are intended to be used for future NEC projects. The outlines of the QMS have been prepared from the PMBOK guide, which has been published by PMI (Project Management Institute, USA) as a guide for project management knowledge and practices. In addition to that, the detailed QMS work frame has been designed on the guidance of relevant literature review and joint meetings with NEC project team. The required data before and after the QMS implementation gathered using questionnaires, and a Matrix model has been used to measure QMS objectives and requirements effectiveness based on the collected data. The final results indicate success on meeting QMS prescribed objectives, while meeting QMS requirements du...

...läs fortsättningen genom att logga in dig.

Medlemskap krävs

För att komma åt allt innehåll på Mimers Brunn måste du vara medlem och inloggad.
Kontot skapar du endast via facebook.

Källor för arbetet

Saknas

Kommentera arbetet: Design and implementation of QMS framework in power plant projects. Garri4 project as a model, Sudan

 
Tack för din kommentar! Ladda om sidan för att se den. ×
Det verkar som att du glömde skriva något ×
Du måste vara inloggad för att kunna kommentera. ×
Något verkar ha gått fel med din kommentar, försök igen! ×

Kommentarer på arbetet

Inga kommentarer än :(

Källhänvisning

Inactive member [2008-01-01]   Design and implementation of QMS framework in power plant projects. Garri4 project as a model, Sudan
Mimers Brunn [Online]. https://mimersbrunn.se/article?id=14470 [2024-04-29]

Rapportera det här arbetet

Är det något du ogillar med arbetet? Rapportera
Vad är problemet?



Mimers Brunns personal granskar flaggade arbeten kontinuerligt för att upptäcka om något strider mot riktlinjerna för webbplatsen. Arbeten som inte följer riktlinjerna tas bort och upprepade överträdelser kan leda till att användarens konto avslutas.
Din rapportering har mottagits, tack så mycket. ×
Du måste vara inloggad för att kunna rapportera arbeten. ×
Något verkar ha gått fel med din rapportering, försök igen. ×
Det verkar som om du har glömt något att specificera ×
Du har redan rapporterat det här arbetet. Vi gör vårt bästa för att så snabbt som möjligt granska arbetet. ×