Internal material handling at Volvo Construction Equipment Braås

1202 visningar
uppladdat: 2008-01-01
Inactive member

Inactive member

Nedanstående innehåll är skapat av Mimers Brunns besökare. Kommentera arbete
Background: Material handling is a large part of a company´s internal work and represents between 15 % and 70 % of the total cost of a manufactured product. By improving the internal handling of material, more efficient distribution and manufacturing flows are possible. The material handling process is an input to the production and assembly process that has to be defined and mapped so that it can be improved. The material handling process studied at Volvo CE Braås includes goods receiving, storage, packaging as well as the order/delivery process to assembly, and will finish with the material transport to the assembly line.Research questions: How can the material handling process, from goods receiving to assembly line, at Volvo CE in Braås be described by using VSM? What kinds of waste can be identified? By proposing a future-state map, how can the identified problems and waste be reduced or eliminated?Methodology: This thesis is a descriptive case study and was conducted with a deductive approach. Data was collected by our own observations, personal interviews, statistics, benchmarking and questionnaire. The scientific credibility of this thesis was secured by for example using many sources, avoidance of assumptions, studying a common process and following standardized steps of the VSM tool.Conclusions: The material handling process was described in the separated areas of goods receiving, storage and assembly line. Visualization was given in a current-state map. Five different kinds of waste were identified. Finally, suggestions of improvements were presented along with a future-state map.Suggestions on future research: A more detailed VSM including information flow and lead times could be studied. Scen...

...läs fortsättningen genom att logga in dig.

Medlemskap krävs

För att komma åt allt innehåll på Mimers Brunn måste du vara medlem och inloggad.
Kontot skapar du endast via facebook.

Källor för arbetet

Saknas

Kommentera arbetet: Internal material handling at Volvo Construction Equipment Braås

 
Tack för din kommentar! Ladda om sidan för att se den. ×
Det verkar som att du glömde skriva något ×
Du måste vara inloggad för att kunna kommentera. ×
Något verkar ha gått fel med din kommentar, försök igen! ×

Kommentarer på arbetet

Inga kommentarer än :(

Källhänvisning

Inactive member [2008-01-01]   Internal material handling at Volvo Construction Equipment Braås
Mimers Brunn [Online]. https://mimersbrunn.se/article?id=18677 [2024-05-18]

Rapportera det här arbetet

Är det något du ogillar med arbetet? Rapportera
Vad är problemet?



Mimers Brunns personal granskar flaggade arbeten kontinuerligt för att upptäcka om något strider mot riktlinjerna för webbplatsen. Arbeten som inte följer riktlinjerna tas bort och upprepade överträdelser kan leda till att användarens konto avslutas.
Din rapportering har mottagits, tack så mycket. ×
Du måste vara inloggad för att kunna rapportera arbeten. ×
Något verkar ha gått fel med din rapportering, försök igen. ×
Det verkar som om du har glömt något att specificera ×
Du har redan rapporterat det här arbetet. Vi gör vårt bästa för att så snabbt som möjligt granska arbetet. ×