PV in Buildings - Analysis, Design & Case Study

894 visningar
uppladdat: 2007-01-01
Inactive member

Inactive member

Nedanstående innehåll är skapat av Mimers Brunns besökare. Kommentera arbete
This theses report is about theoretical study of building integrated photovoltaics and to make BIPV integral part of the houses in 3 different climatic locations Manchester (UK), Dubai (UAE) and Lahore (Pakistan). It starts with BREDEM which is about domestic energy models which also describes Domestic energy requirement, procedures and consumption patterns in line with building energy codes and guidelines for low energy buildings in UK. It also includes methods to calculate energy consumption and decide which portion of energy consumption can be replaced by using BIPV.Planning to install BIPV and simulation with PV Syst. is described, analyzed and concluded. Further domestic energy consumption is explained by selecting a family house in Dubai In absence of building energy codes and weather data. BIPV is planned and simulated by using PV Syst. since weather data for Dubai was not available therefore it is simulated by using closest latitude Karachi (Pakistan) data. Lastly domestic energy consumption is explained by selecting a family house in Lahore (Pakistan).Domestic energy consumption is explained by using HVAC system sizing procedures and building energy codes of Pakistan. BIPV is planned and simulated by using PV Syst. The idea behind this study is to investigate about domestic energy models in different climates by selecting a standard family house (3 bed room).Study also includes the patterns of energy consumption in line with the building energy codes and regulations at three locations i.e. UK, Dubai and Pakistan. Procedures to make BIPV integral part of the building to achieve certain SF of the energy consumption and certain ...

...läs fortsättningen genom att logga in dig.

Medlemskap krävs

För att komma åt allt innehåll på Mimers Brunn måste du vara medlem och inloggad.
Kontot skapar du endast via facebook.

Källor för arbetet

Saknas

Kommentera arbetet: PV in Buildings - Analysis, Design & Case Study

 
Tack för din kommentar! Ladda om sidan för att se den. ×
Det verkar som att du glömde skriva något ×
Du måste vara inloggad för att kunna kommentera. ×
Något verkar ha gått fel med din kommentar, försök igen! ×

Kommentarer på arbetet

Inga kommentarer än :(

Källhänvisning

Inactive member [2007-01-01]   PV in Buildings - Analysis, Design & Case Study
Mimers Brunn [Online]. https://mimersbrunn.se/article?id=22692 [2024-05-15]

Rapportera det här arbetet

Är det något du ogillar med arbetet? Rapportera
Vad är problemet?



Mimers Brunns personal granskar flaggade arbeten kontinuerligt för att upptäcka om något strider mot riktlinjerna för webbplatsen. Arbeten som inte följer riktlinjerna tas bort och upprepade överträdelser kan leda till att användarens konto avslutas.
Din rapportering har mottagits, tack så mycket. ×
Du måste vara inloggad för att kunna rapportera arbeten. ×
Något verkar ha gått fel med din rapportering, försök igen. ×
Det verkar som om du har glömt något att specificera ×
Du har redan rapporterat det här arbetet. Vi gör vårt bästa för att så snabbt som möjligt granska arbetet. ×