Development of a material handling process and layout for the P356 mirror assembly at Schefenacker SVSA: focus on lean thinking, work environment and quality technology management

826 visningar
uppladdat: 2007-01-01
Inactive member

Inactive member

Nedanstående innehåll är skapat av Mimers Brunns besökare. Kommentera arbete
Schefenacker Vision System Australia Pty Ltd (SVSA) is one of 30 companies in the Schefenacker International group, which is the leader in rear vision mirror manufacturer with a 30 percent market share of the world market. SVSA in Adelaide employs over 600 people and the turnover for 2005 was 178 MAUD. This thesis project came about since Schefenacker in Adelaide was going to produce the rear vision mirror for the new Ford Super Duty Truck 2008, with code name P356. Schefenacker desired an optimal material handling process for this complex P356 production. This resulted in cooperation with the University of South Australia and Luleå University of Technology in Sweden and this master thesis project arose. Focus has been put on what could be done in a near future since it felt important to have recommendations that could be put into practice within the close proximity of launch and production. Great importance has been on integrating the employees' opinions into the development and result of this process. A project cycle method was developed to carry out this thesis work, since it was necessary with a primary method which could manage a constant flow of new information. The model was developed with inspiration from the Deming wheel: plan, do, act and learn, together with Ranhagen's spiral model: a process should precede several laps before finish. The philosophy Lean thinking has played an important roll throughout the process. Qualitative facts are the base of this project. The information was gathered through literature studies, a questionnaire, observations and interviews with concerned workforce. The survey questionnaire was carried out in the assembly area of the P356 mirror's predecessor P131. The result from the P131 study has been working as a foundation during the entire project. The authors have been guided for comprehension about which areas improvements would be desirable. The result is also presented in an individual report, consisting of recommendations on how a more efficient production and a better work environment can be achieved at the P131 area. Benchmarking studies at Electrolux, Mitsubishi, Holden and Philmac have been carried out which resulted in greater comprehension of different possibilities concerning material handling. A Specification of requirements for an optimal material handling process with belonging layout was developed. Different layout alternatives with diverse agendas were developed and later on compared. This resulted in a final layout proposal combined of two alternatives, with core focus on safety, minimised material handling and quality issues. In the thesis suggestions can be find about of how and where to store material for the P356 production, which quantities to hold, efficient transportation solutions, other improvement concepts and some warnings concerning future hazard risks in the work environment. Several analysis concerning the material handling processes and the work environment such as NIOSH have been made. According to the authors current buggy runs should be standardised and integrated with supplying the production systems. Dedicated trolleys should be used within the system acting as storage since they are space efficient and prevents double material handling. The developed prototype concept "Ball table trolley" could be an asset in the material handling process, if developed further, according to the thesis authors. The thesis is most useful for Schefenacker but can also contribute to other companies within the automotive industry and in other i...

...läs fortsättningen genom att logga in dig.

Medlemskap krävs

För att komma åt allt innehåll på Mimers Brunn måste du vara medlem och inloggad.
Kontot skapar du endast via facebook.

Källor för arbetet

Saknas

Kommentera arbetet: Development of a material handling process and layout for the P356 mirror assembly at Schefenacker SVSA: focus on lean thinking, work environment and quality technology management

 
Tack för din kommentar! Ladda om sidan för att se den. ×
Det verkar som att du glömde skriva något ×
Du måste vara inloggad för att kunna kommentera. ×
Något verkar ha gått fel med din kommentar, försök igen! ×

Kommentarer på arbetet

Inga kommentarer än :(

Liknande arbeten

Källhänvisning

Inactive member [2007-01-01]   Development of a material handling process and layout for the P356 mirror assembly at Schefenacker SVSA: focus on lean thinking, work environment and quality technology management
Mimers Brunn [Online]. https://mimersbrunn.se/article?id=39627 [2024-05-18]

Rapportera det här arbetet

Är det något du ogillar med arbetet? Rapportera
Vad är problemet?



Mimers Brunns personal granskar flaggade arbeten kontinuerligt för att upptäcka om något strider mot riktlinjerna för webbplatsen. Arbeten som inte följer riktlinjerna tas bort och upprepade överträdelser kan leda till att användarens konto avslutas.
Din rapportering har mottagits, tack så mycket. ×
Du måste vara inloggad för att kunna rapportera arbeten. ×
Något verkar ha gått fel med din rapportering, försök igen. ×
Det verkar som om du har glömt något att specificera ×
Du har redan rapporterat det här arbetet. Vi gör vårt bästa för att så snabbt som möjligt granska arbetet. ×