VALUE STREAM MAPPING – A CASE STUDY OF CONSTRUCTION SUPPLY CHAINOF PREFABRICATED MASSIVE TIMBER FLOOR ELEMENT

1006 visningar
uppladdat: 2007-01-01
Inactive member

Inactive member

Nedanstående innehåll är skapat av Mimers Brunns besökare. Kommentera arbete
The purpose of this Master Thesis is to study how the value stream mapping concept can be applied along the construction supply chain for prefabricated massive timber floor elements. Identification and qualification of waste are starting points to propose suggestions on how to reduce and/or eliminate them. In order to use the value stream mapping along the construction supply chain, pertinent data has been collected and analyzed. To conduct the value stream mapping, the first three steps of the lean thinking principles in construction have been followed. The first step aims at defining the customer and his value as well as the value for the delivery team and how it is specified in the product. The second step is based on identifying the value stream and this is done through defining the resources and activities needed to manufacture, deliver and install the floor elements. This is conducted by using the VSMM methodology. In addition the current practice should be standardized and key component suppliers should be defined and located. The third and last step identifies non-value adding activities, in other words waste and suggestions on how to remove and/or reduce waste have been reached. Wastes from product defects, transportation waste and waste of waiting were to be found in the construction supply chain. Propositions to reduce and/or eliminate wastes were to implement a more careful planning of the manufacturing process and production schedule, to apply lean production principles in the manufacturing facility and decrease and or eliminate storage time. The study made has shown that in the supply ...

...läs fortsättningen genom att logga in dig.

Medlemskap krävs

För att komma åt allt innehåll på Mimers Brunn måste du vara medlem och inloggad.
Kontot skapar du endast via facebook.

Källor för arbetet

Saknas

Kommentera arbetet: VALUE STREAM MAPPING – A CASE STUDY OF CONSTRUCTION SUPPLY CHAINOF PREFABRICATED MASSIVE TIMBER FLOOR ELEMENT

 
Tack för din kommentar! Ladda om sidan för att se den. ×
Det verkar som att du glömde skriva något ×
Du måste vara inloggad för att kunna kommentera. ×
Något verkar ha gått fel med din kommentar, försök igen! ×

Kommentarer på arbetet

Inga kommentarer än :(

Liknande arbeten

Källhänvisning

Inactive member [2007-01-01]   VALUE STREAM MAPPING – A CASE STUDY OF CONSTRUCTION SUPPLY CHAINOF PREFABRICATED MASSIVE TIMBER FLOOR ELEMENT
Mimers Brunn [Online]. https://mimersbrunn.se/article?id=52720 [2024-05-07]

Rapportera det här arbetet

Är det något du ogillar med arbetet? Rapportera
Vad är problemet?



Mimers Brunns personal granskar flaggade arbeten kontinuerligt för att upptäcka om något strider mot riktlinjerna för webbplatsen. Arbeten som inte följer riktlinjerna tas bort och upprepade överträdelser kan leda till att användarens konto avslutas.
Din rapportering har mottagits, tack så mycket. ×
Du måste vara inloggad för att kunna rapportera arbeten. ×
Något verkar ha gått fel med din rapportering, försök igen. ×
Det verkar som om du har glömt något att specificera ×
Du har redan rapporterat det här arbetet. Vi gör vårt bästa för att så snabbt som möjligt granska arbetet. ×